Hagneck Hydroelectric Plant
The existing Hagneck hydroelectric plant, dating from the Jura water correction (1868–1888), consists of a machine hall with supply canal and a separate dam. The project enhances access and integrates new facilities with minimal landscape impact. A surface machine hall with lifting equipment allows vehicle access, while underground facilities remain unchanged. The new concrete dam structure floats visually on the lake landscape.

No items found.


No items found.